8FO8FO Global Trade Platformسلسلة التوريد الصينية · متصلة مباشرةً بالمشترين حول العالم
التوريد الجماعي

Spare Parts & After-Sales Materials Procurement

Centralised spare-parts purchasing, overseas parts-hub deployment and replenishment rules to shorten after-sales response.

السعر المرجعي للوحدة $16,500 / دفعة
وحدة القياس
دفعة
SKU
8FO-GBY-08
مدة التسليم
حسب العقد
استفسر الآن
موارد مباشرة من المنصة

نظرة عامة على المنتج

For companies already shipping in volume whose spare-parts management has become messy — typically parts sent out with each machine, piling up as dead stock, while the part actually needed is out of stock and the machine waits.
The service covers demand modelling for wear and critical parts, centralised purchasing, overseas parts-hub deployment and safety-stock design. Stocking depth per part is derived from failure rate and lead time rather than rules of thumb.
Replenishment triggers by consumption or stock level are configured, and consumption analysis identifies high-failure parts for feedback to R&D. Connection to local repair networks overseas can be added.

أبرز المزايا

Stocking depth derived from failure rate and lead time
Centralised purchasing and overseas parts-hub deployment
Replenishment triggered by consumption or stock level
Consumption analysis flags high-failure parts for R&D

المواصفات

ScopeDemand modelling, purchasing, overseas hub, safety stock
BasisFailure rate and lead-time data
ReplenishmentTriggered by consumption or stock level
AnalysisConsumption review, high-failure parts identified
Add-onsLocal repair network connection
PricingPer batch by parts list

تكون المواصفات النهائية وفقًا لعرض السعر الرسمي وملاحق العقد.

السعر المرجعي المحلي

AEAED 64,000
DE€15,000
US$16,500

منتجات مشابهة

LFP Cells & BMS Group Procurement

Pooled purchasing of LFP cells and battery management systems, with batch consistency d…

$62,000 / دفعة